The Library Remembers When...

 

August 19, 2020



From the Ipswich Tribune July 27, 1927 edition

Café Being Remodeled

The C & C Café is being entirely remodeled this week. It is expected that it will be completed by August first. The floor is to be entirely covered with battleship linoleum. The counter which was formerly in the shape of a horseshoe will be extended full length of the south side of the building and a partition installed in the center.

The north section is to have booths along the wall and tables along the partition. The fixtures are all very up-to-date.

The little dining room in the rear is to be fitted for use for...



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024

Rendered 05/06/2024 07:03