Highway 12 construction set to begin this week

 

April 20, 2022



The South Dakota Department of Transportation (SDDOT) was set to begin construction on U.S. Highway 12 from Aberdeen to Ipswich on Monday, April 18, 2022. (Construction was originally scheduled to begin on Monday, April 11, 2022).

The project consists of modifying intersections, constructing passing lanes, bridge end approach slabs and pavement, lighting, and guardrail. The construction operations will reduce traffic to one lane with a 12-foot width restriction. Traffic will be controlled with flaggers and pilot car at earthwork locations and with a traffic signal for the bridge work.

Motorists should be prepared for suddenly slowing and stopped traffic and be aware of construction equipment and workers adjacent to the roadway.

The contractor on this $13.2 project is Bituminous Paving, Inc. of Ortonville, Minnesota. The completion date for this construction project on Highway 12 is Oct. 29, 2022.

About SDDOT:

The mission of the South Dakota Department of Transportation is to efficiently provide a safe and effective public transportation system.

For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, visit https://sd511.org or dial 511.

Read more about the innovative work of the SDDOT at https://dot.sd.gov.

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024

Rendered 03/06/2024 09:43